Covering all of the UK & Ireland
Precision Utility Mapping was engaged to conduct a comprehensive topographical and utility survey at Ringway Road, with the aim of capturing detailed site data to
Precision Utility Mapping was commissioned to carry out a topographical survey at M5 Junction 21, focusing on St Georges Bridge. The survey was conducted at
Precision Utility Mapping was employed to carry out a full Revit model of Blackhall Substation prior to demolition of the existing building. This was to